MODEL KEBUTUHAN PARKIR MOBIL GEDUNG PERKANTORAN BANK DI KOTA MALANG

MODEL KEBUTUHAN PARKIR MOBIL GEDUNG PERKANTORAN BANK DI KOTA MALANG

MODEL KEBUTUHAN PARKIR MOBIL GEDUNG PERKANTORAN BANK DI KOTA MALANG

Blog Article

Abstract: The Model of Parking Lot Demand for Cars in Bank Office Building in Malang.This research is aimed  to know (l) characteristic of car parking lot at bank  SUNSCREEN office, (2) mathematics model of the demand of parking lot for cars at bank office, and (3) Level of required standard for parking lot at bank office in  Malang.This research is divided into phases, which are: identifying phase, planning phase, acquiring data, analyses and conclusion.The result shows that (l) the maximum accumulation of  car parked at  bank office reach at the daytime with duration between 15 -- 30 minutes.Maximum accumulation occurred between 09.

30 -- 11.45 WIB, Photo Album predominated by short-term parking, mostly occurred in 15 minutes; (2) the mathematics model for the parking demand is functioned as Y = 12.7712 + 0.0128 LLE, with R2 = 0.963, and (3) the required standard of car parking lot is one parking lot per 63 sqm total floor area  (minimum) and one parking lot per 46 sqm effective floor area.

Report this page